Steel Tube Welding Air Flow Access Floor
oduct Structure:
Top
Bottom
Steel Tube Welding Perforated Panel bottom is formed by welded tubes, top plate using extra thick steel plate and punched with different dimension and quantities holes. And then welded with bottom tube structure. This type of perforated panel has great loading performance and various air-flow rate. Top finish can be bare/HPL/PVC.
Panel Type:
Open Rate 20%-Top
Open Rate 20%- Bottom
Open Rate 30%-Top
Open Rate 30%-Bottom
Open Rate 35%-Top
Open Rate 35%-Bottom
Open Rate 45%-Top
Open Rate 45%-Bottom
Heavy Duty-Open Rate 20%-Top
Heavy Duty-Open Rate 20%-Bottom
Heavy Duty-Open Rate 25%-Top
Heavy Duty-Open Rate 25%-Bottom
Application:
Contact: Patrick Chen
Phone: +86-18861159966
Tel: +86-18861159966
Email: info@maxgrid.com
Add: Jiannong Industrial Zone, Yaoguan, Wujin, China